Bridge 20 Replacement

Location: Blandford-Blenheim, Ontario

Type: Bridge Engineering

Three Span Prestressed Concrete Box Girder Bridge

 

K. Smart Associates Limited provided consulting engineering services for the replacement of Bridge 20 over the Nith River on Township Road 12 in the Township of Blandford-Blenheim. Our services for this project included completion of a Schedule B Environmental Assessment, hydraulic design, structural design, preparation of a complete contract document with specifications, contract administration, and construction inspection. 

 

The original bridge was a single lane, single span through truss with a concrete deck and was weight restricted. The existing super-structure had undergone multiple repairs in the past and the substructure was severely deteriorated. Overall, the bridge was in need of replacement. A new design was required to update the structure to current safety standards and improve overall strength, function, and durability. The new structure was opened to traffic in February of 2020.  

 

The replacement structure was determined to be a 64.0 metre long, three span prestressed concrete girder bridge with cast-in-place concrete integral abutments and concrete piers on driven H-Pile foundations. The new bridge provides an 8.0 metre wide roadway platform. 

 

Project Details:

 

Construction Completed: June 2020

 

Construction Cost: $2.4M