Holland Marsh
Location: Bradford West Gwillimbury, Ontario
Type: Municipal Drainage
Holland Marsh Drainage System Canal Improvement Project
The Holland Marsh is a 7,000± acre area of organic land that was reclaimed for agriculture by a substantial drainage and land clearing scheme. The total watershed area is 72,000 ± acres. There are six municipalities within this drain and over 10,000 landowners.
The Holland Marsh Drainage System was designed and constructed for the Holland Marsh lands pursuant to the Drainage Act. The original engineering report was prepared in 1924, with construction occurring in the mid 1920’s.The project involved the interception of the Schomberg Branch of the Holland River at the upstream limits of the area to be reclaimed and its diversion around the perimeter of the area using two drainage canals (North and South Canals).
The material from the canal excavation was used primarily to create dykes on the to-be reclaimed (marsh land) side of the canals. Roads were constructed on top of the dykes to allow for transportation in the marsh area.
In 1954 Hurricane Hazel ravaged the area, breaching the dykes and causing massive flooding. As a result, the channels were enlarged, reducing the separation between dyke and channel. Over the years a number of lives have tragically been lost in the Marsh, due to traffic accidents associated with this road/dyke/channel configuration.
Following a near decade of studies, options analysis and preliminary report investigation work, in 2003, K. Smart Associates was appointed to prepare an Engineering Report on improvements to the Holland Marsh Drainage System under Section 78 of the Ontario Drainage Act. Work on the Engineering Report was suspended in 2004 to undertake a Canadian Environmental Assessment Study as mandated by the Canadian Environmental Assessment Act. The Final Engineering Report was re-commenced and completed in 2009. The report provided for the canals to be improved by shifting the existing canals laterally in some portions and by a bottom cleanout with minor widening in other portions.
Ancillary improvements to the canal system included:
Grading a berm beside the dyke roads on the canal backfill
Repair of scattered lengths of dyke,
Addressing the numerous irrigation inlets, tile drains, and well overflow outlets serviced by or discharging to the canal
Addressing the 13 bridges that cross the canals.
Though the majority of work on the Canal Improvement Project was completed in 2018, there still remains a final component of North Canal work to be completed at the Highway 400 bridge overpass, anticipated to be complete by 2030. At a current total project cost of $26 million, the Holland Marsh Drainage System Canal Improvement Project is by far the largest project completed in Ontario under the framework of the Drainage Act.
Project Details:
Project Manager
Kenn Smart, P. Eng.
Date Appointed:
March 11, 1997 (Preliminary)
May 13, 2003 (Final Report)
Date of Report
January 16, 2009
Date Completed
Main portion completed 2018
Final Highway 400 bridge work still ongoing
Number of Landowners
> 10,000
Watershed Size
29,000ha (72,000 acres)
Drain Length
Open Canal
17km of improvement by shifting canals laterally
11km of improvement by bottom cleanout and widening
Bridges
various improvements to 13 bridges
Actual Cost
Approximately $26,000,000