Parker Drain

Location: Township of East Zorra-Tavistock, Ontario

Type: Municipal Drainage

The Parker Drain is an existing municipal drain originally constructed in 1901, with a portion of the bottom end of the drain reconstructed in 1966. At the time of K. Smart Associates’ appointment in May of 2020, the top half of the drain was still the original 120 year old tile.

 

The original project appointment was made under Section 4 of the Drainage Act following a petition filed to the Township of East Zorra-Tavistock signed jointly by five (5) farm properties. A second petition was received in September 2020 that included an additional two (2) properties.

 

The primary design challenge of this project was the unique crossing of ten (10) Enbridge transmission pipelines, ranging in size from 300mmø to 1200mmø in diameter, and depths ranging from 1.2m to 2.1m below the ground. The varied depths and sizes created the distinct challenge of crossing the pipelines consecutively, with sufficient separation between the pipelines and cover over the drain. Substantial coordination and planning effort was required to not only construct the crossings, but also pre-locate/expose the pipelines in the farm field and the middle of winter, for design.

 

In the end a creative approach was utilized to re-direct as much water away from the natural crossing points, and make deep cuts through hills where the pipelines were the shallowest and most challenging to cross. The final design avoided having to propose three (3) inverted siphons - a necessary feature in the initial draft design.

 

The construction of the Drain also presented some challenges as the pipeline company denied the contractor’s equipment from being able to cross overtop of the pipelines. To avoid having to construct an “air” bridge on site overtop of the pipelines, the contractor and K. Smart Associates Limited agreed the best course of action would be to dig the Parker Drain in under the pipeline as far as they could take it, then track their equipment out to the road, to enter back into the site between the next two pipelines to continue digging. They continued that procedure until all pipelines were traversed.

 

Project Details:

 

Project Manager:

Curtis MacIntyre, P. Eng.

 

Date Appointed:

May 6, 2020 & September 2, 2020

 

Date of Report:

February 3, 2022

 

Date Completed:

June 5, 2023

 

Number of Landowners:

15

 

Watershed Size:

177.6ha (439 acres)

 

Drain Length:

Closed 3,712m & Open 179m

 

Actual Cost:

Approximately $880,000

Photo Gallery

Get In Touch

 

Have a project in mind or looking for expert guidance? Contact K. Smart Associates Limited to start the conversation. We’re ready to help turn your ideas into practical, well-engineered solutions.

 

 