Percon Industrial Subdivision
Location: Milverton, Ontario
Type: Land Development
Project Scope:
This project involved the design of a new industrial subdivision on approximately 35 hectares of land located at the Southwest corner of Line 61 and Perth Road 131 in Milverton, Ontario. We developed a unique servicing strategy for this subdivision. We designed a STEP (Septic Tank Effluent Pump) system, with on-lot primary treatment, which had an outlet directly into the lagoons located off Line 61.
Since the area had inadequate municipal fire flow, we incorporated an on-site fire reservoir and dedicated fire pump station, as well as extending the domestic watermain from County Road 131.
The Stormwater control was completed by a wet pond and forebay, with enhanced grass swales for pre-treatment.
Due to the road crossing an existing open ditch municipal drain a large concrete box culvert was installed at the road crossing.
The work included:
1,340m of road construction
a stormwater management pond
a fire reservoir/pumping station
1,420m of storm sewer
1,910m of sanitary forcemain,
3,435m of watermain (Fire & Domestic)
This industrial subdivision has been partially built out, with some lots left ready for site plan development.
Project Details:
Date of Completion: September 2024