Port Bruce Bridge Replacement

Location: Port Bruce, Ontario

Type: Bridge Engineering

Three Span Steel Girder Bridge 

 

K. Smart Associates Limited provided consulting engineering services for the replacement of the Port Bruce Bridge over Catfish Creek on Imperial Road in Port Bruce. The existing 3 span structure collapsed in February of 2018. Our services for this project included completion of a Schedule “B” Municipal Class Environmental Assessment, hydraulic design, structural design, preparation of contract documents, contract administration, and construction inspection. As the only river crossing in the community, the MCEA process generated significant public interest and input.

 

A temporary modular bridge was installed following the collapse, however, a new design was required to update the structure to current safety standards and improve function, and durability.  Due to the highly public location of the structure, additional aesthetic considerations were made such as decorative end posts and railings.  The new structure was completed in December 2020.

 

The replacement structure is a 76 metre, three-span steel I-girder bridge with integral abutments on driven H-Pile foundations at the piers and abutments. The new structure provides a 10.6 metre wide roadway at the structure, cycle lanes and provision for future street lighting.

 

Project Details:

 

Construction Completed: December 2020

 

Construction Cost: $5.1M

Photo Gallery

Get In Touch

 

Have a project in mind or looking for expert guidance? Contact K. Smart Associates Limited to start the conversation. We’re ready to help turn your ideas into practical, well-engineered solutions.

 

 

CONTACT US